Study on high rock slop anchoring technique of large rock engineering

戴会超  朱红兵  
【摘要】:正 Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R_3350 and R_7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shiplock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shiplock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection(including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shiplock on the Three Gorges Project.

知网文化
 快捷付款方式  订购知网充值卡  订购热线  帮助中心
  • 400-819-9993
  • 010-62982499
  • 010-62783978