| | | | | | 1 | Kaplan, Robert S.; The Four-Stage Model of Cost Systems Design, [M];Management Accounting,; 1990,年 | | 2 | Tsutomu Hara shaman; Cost Flow System for Cost Management RACE 32 [M];Annual Meeting; 1998年 | | 3 | Phillip R Waier; Building Construction Cost Data 2005(Means Building Construction Cost Data) [M];; 2004年 | | 4 | American Institute of Architects; Life Cycle Cost Analysis: a guide for architects [M];; 1977年 | | 5 | Orshan, O; Life Cycle Cost : A Tool for Comparing Building Alternative [M];Proceeding Symposium on Quality and Cost in Building; 1980年 | | 6 | Flanagan, R; Life Cycle Costing the Issue Involved [M];Proceeding of Third International Symposium on Building Economics; 1984年 | | 7 | Flanagan, R; Life Cycle Costing : Theory and Practice[M] [M];; 1989年 | | 8 | Dragoo, R E ,and Rick A; Letendre. Manage Cost in Real Time [M];Cost Engineering; 1994年 | | 9 | T. Alhazmil, R. McCaffer; Procurement System Selection Model [M];Journal of Construction Engineering and Management; 2000年 |
|
| | | | | | 1 | 杜军,顾培亮,焦媛媛; 集成化全面成本管理系统中的成本动因及其选择 [A];Systems Engineering, Systems Science and Complexity Research--Proceeding of 11th Annual Conference of Systems Engineering Society of China [C]; 2000年 | | 2 | 迟鹏武; 我国企业成本管理存在的问题及解决对策 [A];华北、东北地区2007年度烟草学术交流研讨会论文集 [C]; 2007年 | | 3 | 赵国庆,秦金铭; 浅析企业成本管理的弊端及成因 [A];中国烟草学会2006年学术年会论文集 [C]; 2007年 | | 4 | 詹姆斯·哈林顿; 6西格玛以后将是什么? [A];第八届亚太质量组织(APQO)会议论文集 [C]; 2002年 |
|
|
|